Geyto Research · Juan Ferreiro · Essay · · 1 min read

Both sides can change

Why adoption is not only something an organization has to achieve — and what changes when the initiative is open to adjustment too.

When a technology initiative struggles, the conversation can turn to the organization alone. People need more training. Teams need to be more ready. Leadership needs to push harder.

Sometimes that is the right conversation. But it starts from an assumption that is not always examined: that the initiative is fixed, and the organization is the only thing that has to adapt.

A relation, not a test

Every change asks something. Every organization has capacity. What matters is what happens between them.

Seen this way, adoption is not a test the organization passes or fails. It is a relation between two things that can both be shaped: what the initiative demands, and the capacity that is situated to respond and sustain it.

What adjusting the initiative can look like

Opening the initiative to adjustment does not mean lowering ambition. It can mean:

  • Changing the sequence. Starting where support is strongest, instead of where the rollout plan says to start.
  • Changing the timing. Moving a new step away from the busiest moment of the work.
  • Changing what is asked first. Introducing the parts of the change that fit the current routine before the parts that require a new one.
  • Changing the support. Keeping help close to the work for longer than the project plan assumed.

What building capacity can look like

On the other side, capacity may be missing in a precise place rather than everywhere: a shift with one supervisor for three zones, a team that never had time to practise, a role that now carries decisions nobody made before.

Building capacity in those places — time, skill, support, rhythm — may be more useful than training everyone again.

Why this matters

When only one side is allowed to move, the conversation becomes a search for who is failing. When both sides can move, it becomes a design question: what would it take for this change to become part of the work, here?

That is the question Geyto works on.

Share